The biggest ever XPS line has reached East Europe
The new TDS135-TDD500 XPS production line has been unloaded in East Europe lately and is expected to be installed in September. This is the biggest foam extrusion line we have
Petrochemical
New Energy
Plastic & Rubber Recycling
UHMWPE Fiber
Meltblown Lines
Home / XPS Production Line
The new TDS135-TDD500 XPS production line has been unloaded in East Europe lately and is expected to be installed in September. This is the biggest foam extrusion line we have
We have installed and commissioned the highest-altitude XPS line ever this week in Lhasa Tibet, where the altitude reaches 3600m. This is a TDS95-TDD250 line which can produce 800-1000kg/hr with
In early March of 2021, the brand new TDS95-TDD250 CO2 XPS production line in Hangzhou Guangwei Insulation Materials Co., Ltd is successfully commissioned and put into production. Currently the client
We make the impossible possible. 1,200kg/hr XPS line has been up and running with remote technical support. Commissioning XPS line has been seen as one of the most challenging job
Breaking The Record – 1,000kg/hr Made By Us in 2009 The biggest ever China-made XPS production line is being wet tested successfully. In 2009, we delivered the then-biggest CO2 foam
New TDS110-TDD300 CO2 foam XPS production line has been up and running in Bang Leader (Taian Shandong China). The line is running at 1312kg/hr (1236kg recycled polystyrene and 76kg blowing
After the campaign of replacing HCFCs with CO2 as the main blowing agent in XPS production, the thermal conductivity is a challenge for XPS boards. Aluminium or magnesium particles were
Komez is newly established company which is especially in insulation materials. These three lines are respectively two TDS95-TDD250 which are mainly for wall and roof thermal insulation and one TDS75-TDD150
Last week, Mr. Cliff Zhang, the person in charge of Foam Division at Useon Extrusion, visited Kuwait for the acceptance of UNIDO (United Nations Industrial Development Organization) funded CO2 foam
Last week, the UN Resident Coordinator and UNDO Resident Representative Mr. Nicholas Rosellini, as well as Mr. Xiao, the Vice-Director of FECO visited USEON. During their visit, we reported our
Congratulations to Useon’s foam team for getting a big order of 1,200kg/hr CO2 foam XPS production line which is comprised of TDS110 twin screw extruder and TDD300 single screw extruder.
Useon Foam Team has been engaged in HCFC phasing-out program for years. This inspiring news from BBC is a comfort for our team that the first clear evidence that the
© 2024 USEON Technology Limited